- Home
- Town Government
- Code Central
- Land Development Applications and Checklists
Land development applications and checklists
All land development requests begin with the applicant completing an application form and submitting that with the material required by the appropriate submittal checklist. Please schedule an application submittal meeting with a project manager by calling 303-660-1393, or email the Planning Division.
Application forms
- Board of Adjustment application (PDF)
- Field change order request (PDF)
- Historic Preservation Board application (PDF)
- Land development application (PDF)
- Pre-Application Meeting (PREAPP) (PDF)
- Revocable encroachment agreement application (PDF)
- Site construction and GESC plan extension application (PDF)
- Technical criteria variance request (PDF)
- Administrative variance application (PDF)
Submittal checklists
- Sketch plan (PDF)
- Annexation (PDF)
- Planned Development Plan (PDF)
- Site Development Plan (PDF)
- Wireless use by special review (PDF)
- Historic research guide (PDF)
- Plat (PDF)
- Construction documents (PDF)
- Digital submittal requirements upon approval of construction drawings (PDF)
- Concept utility letter checklist (PDF)
- Preliminary utility report checklist (PDF)
- Final utility report checklist (PDF)
- Phase I drainage report checklist (PDF)
- Phase II drainage report checklist (PDF)
- Phase III drainage report checklist (PDF)
- Straight Zone checklist (PDF)
- TESC Drawing and report checklist (PDF)
- Landscape plant schedule (XLSX)
- Landscape multi-family site inventory table (XLSX)
- Landscape non-residential site inventory table (XLSX)
- Landscape streetscape table (XLSX)
- Landscape irrigation chart (XLSX)
- Hydraulic worksheet (XLS)
- Irrigation details (PDF)
- Luminary Summary Table (XLSX)
Other
- Construction cost estimate template (XLS)
- Construction document signature block and standard notes (PDF)
- Opinion of Probable Costs (PDF)
- Affidavit of mailing (DOC)
- Affidavit of posting (PDF)
- Signature blocks (PDF)
- Site Development Plan standard notes (PDF)
- Planned Development Plan standard notes (PDF)
- Utility Report approval blocks (DOC)
- Water Quality Certification Form (PDF)