Sellars Gulch Bridge Rehabilitation Project

About the project
This project is required to rehabilitate the existing bridge at Plum Creek Parkway and Sellars Gulch to prevent failure of the culverts and ensure proper stormwater conveyance. Improvements will consist of slip lining two of the six existing corrugated metal pipe (CMP) culverts and placement of reinforced concrete paving in the invert of the four remaining culverts.

Rehabilitation of the culverts will maximize the overall lifespan of the bridge while minimizing disruption to the public. Grant funding for the project was obtained thru the Colorado Off-System Bridge Program. The total budget for this project is $680,000 (Grant - $554,000, Town Match - $126,000).

Status
The Town is currently working to finalize the agreement with Colorado Department of Transportation (CDOT) for grant funding and anticipates completion of design in 2016.

Construction schedule
Construction is anticipated to take place in late 2016, early 2017.

More information
View a map of the area.

Contact
Residents are advised to contact the Stormwater Department with any concerns and questions at 720-733-6011 or email.